Javascript is required to run this page

HB1202

Electrical transmission lines; approval of underground construction, establishes pilot program.

Status:
Killed

Chief Patron:
Tim Hugo (R)

Session:
2018 Regular Session

Summary

As Introduced. Electrical transmission lines; approval of underground construction; pilot program.

Establishes a pilot program consisting of the approval of the underground construction of two electrical transmission lines. As a part of the pilot program, the State Corporation Commission (SCC) is directed to approve as a qualifying project a transmission line that appears to track the I-66 Hybrid Route that has been considered in the application of Dominion Energy for the Haymarket transmission line project in Prince William County. The measure establishes criteria to be used by the SCC in approving the second project. The approval of a transmission line satisfies local zoning requirements. The SCC is directed to approve a rate adjustment clause to allow the utility to recover from the utility's Virginia jurisdictional customers the costs of the project that are not otherwise recoverable under existing provisions. The measure directs the SCC to submit annual reports on the pilot program. (Less)
  • Bill History

  • 01/10/2018 - House: Prefiled and ordered printed; offered 01/10/18 18104402D
  • 01/10/2018 - House: Referred to Committee on Commerce and Labor
  • 01/21/2018 - House: Impact statement from SCC (HB1202)
  • 01/23/2018 - House: Assigned C & L sub: Subcommittee #3
  • 01/30/2018 - House: Subcommittee recommends incorporating (HB1558-Kilgore)
  • 02/13/2018 - House: Left in Commerce and Labor

Full text and vote history:

Virginia Legislative Information System

RichmondSunlight.com


See other bills related to: